. MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE 4 - 23 2. Stop the engine, the n turn valve (1) of corrosion re sistor (2) to the CLOSE stoppe r position.(Only machines equipped with corrosion resistor) 3. Turn radiator cap (3 4. Prepare for a cont ainer to receive drained sup er coolant- mixed cooling water , pull out radiator hose (4) tuck ed away in the lower portion of the machine's front right side, and then to drain the water. ) fitted to the water pump piping on the o drain water. (5) and (6) after draining and fill with tap open drain valve (5) 5. Open drain valve (6 engine's right side t 6. Close drain valves water. 7.
When the radiator is filled with water, start the en gine, run at ° 8. low idling, raise the run the engine for a Stop the engine and water temperature to at least 90 C, then pprox. 10 minutes. then open drain valves (5) and (6) to drain 9. the water. After draining the wa agent. ter, clean the cooling system with cleaning For the cleaning me thod, see the instructions for t he cleaning agent. 10. Close drain valve (5 11. Replace the corrosi on resistor, then open valve (1 For details of the method of replacing the corro CARTRIDGE (PAG E 4-70)". (Only machines equi 12. Fill with coolant and tap water until the water overflo ws from the water filler.
Determine the proportions of coolant and water in accord ance with the table "Mixing rat e of water and antifreeze". 13. To bleed the air from the cooling system, run the e ngine at low idle for 5 minutes, and fo r a further 5 minutes at high idle. (When doi ng this, leave the radiator cap off.)