Freightliner — 122SD, Coronado 132

Frame and Frame Components 31 Remove the 294 bolt. Using dye penetrate or magnetic particle testing along the length of the bolt, inspect for fractures. If the 294 bolt has no damage, install it and continue to use for another 6 months. If the 294 bolt is fractured, DO NOT USE. Con- tact Premier Mfg. Co. 1 year after installation date: Regardless of service duty, replace the 294 bolt with a new one. 1 2 3 f310313a 07/13/2010 4 1. Linch Pin 2. Handle 3. Pintle Hook 4. 294 Bolt Fig. 11, Premier 690 Trailer Coupling 122SD and Coronado 132 Maintenance Manual, February 2016 31/9