Freightliner — 122SD, Coronado 132

Brakes 42 6 2 WARNING Do not attempt to disassemble the desiccant car- tridge assembly. Parts for the assembly are not available and the cartridge contains a 150 lb spring that cannot be mechanically caged. Disas- sembly could release the spring, resulting in per- sonal injury. 4 5 4. Remove and discard both O-rings from the car- tridge bolt. 1 & 9 3 5. Using a clean rag, wipe clean the inside of the end cover. Clean the cartridge bolt bore in the end cover, and the sealing surfaces for the large- and small-diameter desiccant cartridge sealing rings. 7 8 6. Inspect the end cover for physical damage, then inspect all air line fittings for corrosion; replace as necessary. 09/20/94 f420544a Fig.

2, AD–9 End Cover to Housing Torque Pattern 7. Clean and inspect the bolt, paying attention to the threads and O-ring grooves. 17. Install the air dryer on the lower mounting bracket. Install the two previously marked bolts, four washers, and two new Nylok nuts. Torque the two remaining Nylok nuts 17 to 24 lbf·ft (23 to 33 N·m). Install the bolt, two washers, and a new Nylok nut in the upper mounting bracket strap. Torque the upper mounting bracket strap Nylok nut 80 to 120 lbf·in (900 to 1360 N·cm). IMPORTANT: Use only the grease supplied with Bendix replacement kits. 8. Lubricate the O-rings, bolt O-ring grooves, seal- ing rings, and cartridge grooves.

Lubricate the end cover bore for the bolt. 9. Install both O-rings on the cartridge bolt, then, using a twisting motion, insert the assembled desiccant cartridge bolt in the end cover. 18. Connect and tighten the three air lines. Connect the harness connector to the heater and thermo- stat assembly until the lock tab snaps in place. 10. Install the desiccant cartridge on the end cover, making sure the cartridge is properly seated and flush on the end cover. NOTE: It may be necessary to rotate the car- tridge slightly until the anti-rotation lugs are properly aligned and allow the cartridge to rest flush against the end cover. 19.

Start the engine, build the air pressure, and check the air brake system for leaks. If any air leaks are present, see Group 42 of the vehicle Workshop Manual for diagnosis and repair information. AD–IP 11. Using a wrench or socket, tighten the desiccant cartridge bolt 70 lbf·ft (95 N·m). Do not over- torque. 1. Park the vehicle on a level surface, apply the parking brakes, and chock the tires. 2. Using a wrench or a socket, loosen the desiccant cartridge bolt. Then separate the desiccant car- tridge from the end cover. 12. Before placing the vehicle in service, perform the test below. 3. Pull the cartridge bolt out of the cover and re- move the cartridge.

12.1 Close all reservoir drain cocks. 12.2 Build system pressure to governor cut- out, and note that the AD-IP air dryer purges with an audible escape of air. 122SD and Coronado 132 Maintenance Manual, February 2016 42/3