Freightliner — 122SD, Coronado 132

Brakes 42 1 2 11 3 4 9 25 5 12 10 10 8 14 24 10 10 10 6 10 8 23 10 13 15 22 7 8 21 20 17 18 19 16 08/09/95 f421383 1. 5/16 x 4-1/2 Upper Mounting Bracket Bolt 2. Upper Mounting Bracket Strap 3. Lockwasher 4. 5/16-Inch Nylok Nut 5. Upper Mounting Bracket 6. Housing 7. Nylok Nut 8. 3/8-Inch Special Washer 9. Desiccant Cartridge 10. O-Ring 11. Safety Valve 12. Lower Mounting Bracket 13. 3/8-Inch Bolt (long) 14. Check Valve Assembly 15. Purge Valve Assembly 16. Purge Valve Capscrew 17. Exhaust Diaphragm 18. Purge Valve 19. 1/4-Inch Tapping Screw 20. Purge Valve Housing 21. Heater and Thermostat Housing 22. Return Spring 23. Purge Piston 24. 3/8-Inch Bolt 25. End Cover Fig.

1, AD–9 Air Dryer (exploded view) 12. Lubricate the O-rings with silicone or lithium grease and install them in the end cover. NOTE: Desiccant cartridge torque should not exceed 50 lbf·ft (68 N·m). 13. Install the desiccant cartridge on the end cover. Turn the cartridge clockwise until the desiccant cartridge makes contact with the end cover. 15. Place the housing over the desiccant cartridge and align the mounting holes with the end cover. 14. Place the desiccant cartridge in a vise, and turn the end cover clockwise an additional 180 to 225 degrees to fully tighten the desiccant cartridge to the end cover. IMPORTANT: Replace, do not reuse the Nylok nuts on the air dryer cover. 16.

Install the 6 bolts, 12 washers, and 6 new Nylok nuts. Torque the Nylok nuts in a star pattern 17 to 24 lbf·ft (23 to 33 N·m). See Fig. 2 . 122SD and Coronado 132 Maintenance Manual, February 2016 42/2