OPERATION OPERATION INSPECTION AND ADJUSTMENT G Properly adjust track tension. Check the track tension by measuring clearance A between the idler and carrier roller shown in the figure at right. Clearance A should be 20 to 30mm (0.8 to 1.2in) nor- mally. Tense the track a little more for operation on rocky terrain and loosen it a little for operation on clayey terrain. Carrying out operations when the track is excessively loose may cause abnormal vibration and abnormal wear of the sprocket teeth. (For inspection and adjustment procedures, refer to "CHECK TRACK TENSION (PAGE 4-25)"). G Check idler rollers for oil leakage as well as for loose bolts and nuts.
If any trouble is detected, repair immediately. G Check clearance B between the idler guide plate and track frame. If clearance B increases, idler may move sideways and the tracks may come off. (For inspection and adjust- ment procedure, refer to "ADJUST IDLER CLEARANCE (PAGE 4-30)".) 3-85