Cummins — CELECT™ ECM COOLING PLATE - INSTALLATION

Engine Assembly (00-02) CELECT™ECM Cooling Plate - Installation N14 Page 0-125 STC Engines Install the fuel pump drive spider coupling. Use a new gasket to install the fuel pump. Install the four fuel pump mounting capscrews. Torque Value: 47 [35 ft-lb] Install the AFC air signal line and fuel tubing: Gear pump cooling drain (1) Fuel inlet supply (2) Fuel rail pressure line (3) AFC air signal line (4) Tachometer cable (5) Fuel pressure sensing line (to STC valve) (6) Engines using PT PACER require a mounting support bracket on the fuel pump and engine block due to the added weight of the PT PACER pump.

The PT PACER pump support bracket is required to provide acceptable fuel pump mounting gasket perfor- mance. Install the bracket and tighten the capscrews alternately and evenly to both the fuel pump and engine block. Torque Value: 47 [35 ft-lb] CELECT™ECM Cooling Plate - Installa- tion Install the cooling plate. Install the heat resistant grom- mets on both sides of the cooling plate. Install the two heat resistant star washer grommets at the same mount- ing location. Tighten the four capscrews. Torque Value: 41 [30 ft-lb]