hitachi — Installation

1B-34 Engine Mechanical (6WG1 (Common rail)) Apply a small amount of liquid gasket to the two O-ring slots on the oil pipe, then install the O- rings. Rotate the crankshaft forwards and line up the flywheel carved line with the dynamic pointer so that the number 1 cylinder reaches the compression top dead center. At this time check that the number 1 cylinder intake and exhaust gas valve has clearance. Tightening torque: 50 N m {5.1 kgf m} Legend 1. Turbocharger 2. Oil return pipe (turbocharger) 3. Oil feed pipe (turbocharger) 4. Oil port Install the pointer to the PTO gear ASM side. Insert an O-ring into the gear case installation section.

Line up the PTO gear ASM axel key, install the coupling, line up the pointer and coupling side marking [A] and fit the gears. After fitting the gears, move so that the coupling [S] mark position and pointer tip line up. 12. Install the PTO gear ASM. Install the PTO gear ASM shaft to the gears beforehand. Apply molybdenum disulphide to the bolt screw section and bearing surface, and tighten to the correct tightening torque in the order shown in the diagram. Tightening torque: 39 N m {4.0 kgf m} angle method 90 ° ~ 120 °