Engine Mechanical (6WG1 (Common rail)) 1B-35 Rotate the PTO shaft a very small amount, and after the gears engage, completely press the gear case in until it adheres. At this time, check that the pointer and coupling mark [S] are lined up. If they are out of line, the gears have shifted so the process needs to be re-done. 13. Install the oil pipe for the PTO and fix it with clips. Legend 1. PTO gear ASM 2. Clip 3. Oil pipe 4. Clip Legend 1. Pointer 2. S mark (marking) 3. A mark (marking) 4. Coupling 14. Line up and install the supply pump bracket with the dowel hole. Bracket tightening torque: 108 N m {11.0 kgf m}