hitachi — Assembly

Lubricating system (6WG1 (Common rail)) 1H-19 3. Remove the oil cooler element. Inspection Oil cooler element Inspect the oil cooler element for cracks. Perform red check method inspections whenever necessary. Oil cooler element cleaning Pour cleaning fluid into the element and soak the inside for approx. 10 hours. After that remove approx. 1/3 of the cleaning fluid, then eject the rest from the oil port by blowing through approx. 196 Kpa {2 kgf/cm 2 } of compressed air. This operation can be repeated a number of times depending on how dirty the element is. Oil thermo valve Inspecting the oil thermo valve for blockages/ damage Inspect the piston and valve seat surface for wear or damage.

Also, inspect the spring for damage and weakness. Oil thermo valve operational checks Inspect whether the valve opens at 98 ° C. Caution: Fire is strictly prohibited near the cleaning fluid. Masks and protective glasses must be worn, and the work must not be carried out in a closed room. Oil thermo valve opening temperature: 98 ° C 4. Remove the gasket. 5. Remove the oil pipe. 6. Remove the O-ring for the oil pipe. 7. Remove the oil thermo valve. 8. Remove the clearancer. 9. Remove the oil thermo valve support. 10. Remove the seal ring. 11. Clean the wall of the body case and inspect for corrosion etc. Assembly 1. Set the body case.

Using undiluted solution Using diluted with light oil (white spirit) Hi-aromu 2S (New Nippon Oil) { — Suwazoru 310 (Maruzen) { — Hi-zoru (Showa) { — Mobile Zol A (Mobil Sekiyu) — {