Kaiyi — Kaiyi Hydraulic Systems Maintenance Manual

侍 Hydraulic oil must be at operating temperature for these checks (refer to page 6-55). 6-41 Item Description Service action Hydraulic system warm-up procedure Run engine at high idle. Refer to page 6-55. Hold a hydraulic function over relief to heat oil. (don't keep relief condition over 5 seconds at a time) Periodically cycle all hydraulic functions to distribute warm oil. Repeat procedure until oil is at operating temperature. FEEL : Hydraulic reservoir must be uncomfortable to hold your hand against. (approximately 40 ~50˚C) OK Check completed. Hydraulic pump performance check Heat hydraulic oil to operating temperature. Run engine at high idle.

With bucket flat on ground, actuate boom raise. Time how long it takes to raise boom to full height. LOOK : Boom must raise to full height in less than 7 seconds. OK Check completed. NOT OK Go to priority valve (in steering valve) high pressure check at page 5-26. IF OK Do steer ing system leakage check at page 5-27. IF OK Do main hydraulic pump flow test at page 6-56. Control valve lift check Run machine at low idle. With bucket partially dumped, lower boom to raise front of machine. Slowly move boom control lever (RCV lever) to boom lower position. Slowly move bucket control lever to bucket dump position. LOOK : Boom must not raise before moving down.

Bucket must not rollback before dumping. OK Check complete. NOT OK Repair lift checks in loader control valve.