Kaiyi — Kaiyi Hydraulic Systems Maintenance Manual

侍 MEASURING BOOM AND BUCKET CYCLE TIME 1) MEASUREMENT CONDITION 1) MEASUREMENT CONDITION В Coolant temperature : Inside operating range В Steering position : Neutral В Hydraulic temperature : 40~50 C В Bucket : Unloaded В Engine speed : High idling 2) MEASURING TOOL 2) MEASURING TOOL В Stop watch (1EA) 3) MEASURING PROCEDURE 3) MEASURING PROCEDURE (1) LIFTING TIME OF BOOM Set the bucket near the maximum tilt back position and at the lowest position on the ground. Raise the bucket and measure the time taken for bucket to reach the maximum height of the boom.

Lifting time of boom 7609A6WE25 (2) LOWERING TIME OF BOOM LOWERING TIME OF BOOM Set the bucket horizontal with the boom at the maximum height, lower the bucket and measure the taken for the bucket to reach the lowest position on the ground. Lowering time of boom 7609A6WE26 (3) DUMPING TIME OF BUCKET DUMPING TIME OF BUCKET Raise the boom to the maximum height and measure the time taken for the bucket to move from the maximum tilt back position to the maximum dump position Dumping time of bucket Rollback time of bucket (4) ROLL BACK TIME OF BUCKET ROLL BACK TIME OF BUCKET Raise the boom to the maximum height and measure the time taken for the bucket to reach the maximum tilt back position.

7609A6WE27 6-45