. OPERATION OPERATION 2. Blade control lever (2) to the full RAISE position, then hold the lever in position, and operate slowly to the left tilt relief and right tilt relief positions for 5 minutes. 3. Then operate blade control lever (2) to the full RAISE position (up to the lever stroke end) and hold it in that position; alternate the right and left TILT relief intermittently; lower the blade to the ground by operating the control lever to the LOWER position; operate the control lever to the FLOAT position (up to the lever stroke end); and alternate right and left TILT relief intermittently for 5 minutes. 4.
Lower the blade to the ground, move the control lever fully to the FLOAT position (lever stroke end) and hold the lever in position for 1 minute. Next, release the lever and check that it stays in the FLOAT position. After waiting for 3 minutes, return the lever to the HOLD position. (A) (B) (C) RAISE HOLD LOWEW (D) (E) (F) FLOAT LEFT TILT RIGHT TILT 3 - 117 STARTING IN COLD WEAT HER OPERATION) an automatic warming-up device. (AUTOMATIC WARMING-UP This machine is equipped with an automatic w arming-up devic When the e ngine is s tarted, i f the engine coolant t emperature is low (below out automa The autom 30 °C (86 °F)), the warming-up operation is carried tically.
atic warming-up operation is canceled if the engine coolant tem (86 °F)) or minutes. If perature reache if the warming- the engine coo s the specified up operation i lant temperatu temperature (30 s continued for re or hydraulic °C 10 oil temperatur e are low after th e automatic warming-up o peration, warm the e ngine up further as follows . 1. Turn fuel c ontrol dia l (1) to th e center positio n between Low i dle (MIN) and High idl e (MAX ) and ru n t he engin e at medium . medium speed for approximately 10 minutes with n o load