. MAINTENANCE SERVICE PROCEDURE ADJUSTING TENSION OF CENTER BRACE (Straight tilt dozer) (Straight tilt power pitch dozer) (Sigma dozer) (Sigma power pitch dozer) WARNING adjusting, see "ADJUSTING side. At that time, adjust clearance 4 - 51 In c ase the work equipment assem bly is disassembled for transportatio n and r eassembled at a worksite, tension of the center brace has to be adjusted anew. Otherwise the bushing at the connecting part of bla de and straight frame will likely slip off, allowing sand and dirt to enter the bushing, which eventually leads to prema ture wear or damage of t he bushing.
Make this adjustme Except when operating the blade in Ste p 4, always lock the blade control lever s ecurel y with the work eq 1. Adjust with shim (2) so that the mm (0.008 to 0.028 in). For details of the method of SHIMS AT CENTER BRACE ( 2. Loosen bolt (3). Install the blade assembly. 3. 4. Operate the blade control lever 5. Insert the bar in center brace h ole (4) and turn the bar to the protruding between the track shoe and fra me (A) so that it is equal on the righ t and l Rotating torque: 24.5 to 49 Nm (2.5 to 5 kgm, 18.1 to 36.2 lbft) (Blade at Standard distance between the D65EX:
995mm (39.2 in) (Strai ght tilt dozer), (Straight tilt power pitch 991mm (39.0 in) (Sigm a dozer), (Sigma power pitch dozer) D65PX: 992mm (39.1 in) (Strai ght tilt dozer), (Straight tilt power pitch D65WX: 992mm (39.1 in) (Sigm a dozer), (Sigma power pitch doze 6. Tighten bolt (3). Tightening torque: 490.3 to 608 Nm (50 to 62 kgm, 361.7 to 448.4 l bft