. MAINTENANCE SERVICE PROCEDURE ADJUSTING SHIMS AT TRUNNION Tightening torque Work equipment Straight tilt dozer Straight tilt power pitch dozer Sigma dozer Sigma power pitch dozer Angle dozer 785 to 980 Nm (80 to 100 kgm, 578.6 to 723.3 lbft) 1,150 to 1,440 Nm (118 to 147 kgm, 853.5 to 1,063.3 lbft) Power angle power tilt dozer 8. Operate the work equipment and check that there is no abnormal noise or abnormal play. 4 - 50 Correct val ue for play at ball joint: Standard s Use the follow ing procedure to adjus t the play at the bal l joint to t he correc 1. Remove b olts (1), then remove c ap (2). the sliding surface of ball (3). 1) temporarily. .2 to 49 Nm (4 to 5 kgm, 28.9 to 36.2 lbft) 2.
Wipe off t he grease and dirt from the sliding surface of ball (3 3. Remove a ll shims (4). 4. Install cap (2) and tighten bolts ( Temporar y tightening torque: 39 .2 to 49 Nm (4 to 5 kgm, 28. 9 to 36.2 l bft) 5. Measure clearance at portion A ( top) and portion B (bottom) of ball join t, and calc ulate avera ge clearance [C = (A+B )/2]. t the shim thickness is (C + 0.2) to (C + 1.2) mm. thickness can be set in units of 1 mm. olts (1), then remove cap (2). thickness of shim measured in Step 5, then tighten cap (2) fully with bolts (1). olts (1) in turn at the top and bottom to reach the specified torque.
Set so tha t the shim thickness is (C + 0.2) to (C + 1.2) The shim thickness can be set in 6. Remove b olts (1), then remove c 7. Install the thickness of shim mea sured in Step 5, then tighten cap ( 2) f ully with bo Tighten b olts (1) in turn at the to p and bottom to reach the sp ecifie d torque.