. ATTACHMENTS, OPTIONS HANDLING HYDRAULIC RIPPER ATTACHMENTS, OPTIONS HANDLING HYDRAULIC RIPPER shank hole, then REPLACEMENT OF POINT 6 - 6 Whe n changing the digging depth, do as follows. 1. R emove cotter p in (1). 2. R emove pin (2), chang sert pin (2). 3. In sert cotter pin A poi nt is installed to protect the shank . If t he point is w orn, replace it as f ollows. 1. P ut a pin remov er in contact with t he pin marked by the arrow nd tap with a h ammer t o remove. 2. R eplace the poin 3. In sert the pin ha lf way, t hen knock it i n fully with a hammer NO. Check Item Criteria Standard Repair dimension limit Remedy Repair limit (1) Wear of point (a) 277 mm 170 mm Replacement