MACHINE OPERATIONS AND CONTROLS OPERATION 3. Install the bucket inversely. After the bucket is inversed, correct the inclination and direction of the retaining pin holes (1) and (2) and stabi- lize the bucket securely. 4. Align the arm with holes (1) and the link with holes (2), then coat with grease and install pins (A) and (B). REMARK When installing the bucket, the O-rings are easily damaged, so fit the O-rings on the boss of the arm end as shown in the dia- gram. When knocking in the pins, move the O-ring down to the regular groove. 5. Install the stopper bolts and nuts for each pin and ring plate, then grease the pin.
Handling ring plate Do not make a gap of more than 30 mm (1.18 in) in the ring plate. If there is play in the ring when it is installed to the bucket, replace it with a new part. 3-80