Ditch Witch SK1050 — Startup/10 Hour

Service - 76 SK1050 Operator’s Manual Startup/10 Hour Check Track Tension Check track tension at startup and every 10 hours and adjust as needed. Adjust track tension using one of the two methods below, depending on machine configuration. Straight Edge Adjustment Track is correctly tensioned when measurement between track and straight edge (2) is 1/2 in (13 mm). To adjust: 1. Park machine on smooth, flat surface. 2. Lay straight edge on top of track, spanning from sprocket to front idler roller. 3. Clean track cylinder zerk (1). Pump MPG into zerk until distance between track and straight edge (2) is 1/2” (13 mm). 4. Test : Drive forward one track length and check tension again.

If tension is too loose, repeat step 3 above. If tension is too tight, loosen fitting on grease cylinder and allow a small amount of grease to discharge from cylinder. Tighten fitting and test again. Pressure Gauge Adjustment 1 2 Track is correctly tensioned when gauge measures between 700-900 psi (48-62 bar). To adjust: 1. Remove gauge from operator’s manual compartment. 2. Thread gauge (1) into connection (2). 3. Pump MPG into grease zerk to check pressure. t46om008w.eps 2 1 t35om033w.eps 2 1 t35om033w.eps