Caterpillar — Maintenance Interval Schedule (MIS)

216 Maintenance and Lubrication Section (Pipelayer Attachment Kit) WEBM1000 Boom Line – Install 286 Illustration 286 nstalling boom line (A) Wire rope from the winch (B) Detail B 6. Install the wire rope from the winch to sheave (8) in the upper sheave block. Install the wire rope over sheave (8) from the front of the machine toward the rear of the machine. 7. Install the wire rope under sheave (9) in the lower sheave block. 8. Install the wire rope over sheave (10) in the upper sheave block.