Caterpillar — Maintenance Interval Schedule (MIS)

217 WEBM1000 Maintenance and Lubrication Section (Pipelayer Attachment Kit) 287 Illustration 287 Inserting wire rope into cable anchor 9. Insert the wire rope into the pocket and around the wedge (11). Allow an additional length of cable to form a tail end (six inch minimum). Use a mallet to tap the wedge and the wire rope into the pocket. 288 10. Insert the tail end of the wire rope through clamp (12). Add a short piece of wire rope through clamp (12) in order to secure the clamp, as needed. Tighten the nuts on the clamp. Note: Do not clamp the loaded end of the wire rope and the tail end of the wire rope together. Illustration 288 11. Apply the first load in order to seat wedge (11).

Boom pivot pins, grease fittings Boom Pivot Pins – Lubricate Lubricate the boom pivot pins through the two fittings. The grease fittings for lubricating the boom pivot pins are located on the left side of the machine. There is one grease fitting for each pin. The grease fittings are located on the end of the pin on the outside face of the boom.