John Deere 400 6076 — John Deere 400 6076 User Manual

Cylinder Block, Liners, Pistons and Rods/Install Piston Pin in Piston Pin Bore MEASURE OIL CONTROL RING GROOVE 1. Check oil control ring-to-groove clearance by installing a new ring in groove. 2. Measure clearance with a feeler gauge at several points. Compare measurements with specifications given below. RG5234 -UN-13DEC88 OIL CONTROL RING-TO-GROOVE CLEARANCE SPECIFICATIONS New Part Clearance . . . . . . . . . . . . . . . . . . . . . 0.064—0.102 mm (0.0025—0.0040 in.) Maximum Serviceable Clearance . . . . . . . . . . . . . . . . . . 0.165 mm (0.0065 in.) NOTE: Replace piston and liner (as a set) if oil control ring clearance exceeds specifications given.

S11,2010,JF -19-29OCT92 INSTALL PISTON PIN IN PISTON PIN BORE 10 18 NOTE: Piston pin must be in good condition and not worn beyond specification given below. 1. Dip piston pin in clean engine oil. RG5231 -UN-13DEC88 RG4984 -UN-26JUL94 2. Install pin (A) through piston. Pin should pass through piston using only light thumb pressure. Check taper in piston pin bore by inserting pin from both sides. If pin enters freely, but binds in the center, the bore could be tapered (B). If bore is not tapered, insert pin to check for bore alignment. Pin should not “click” or need to be forced into bore on opposite side (C). 3. Check piston pin and piston bore specifications.

If either are not within specification, replace pin, piston, and liner. PISTON PIN/BORE SPECIFICATIONS Piston Pin OD . . . . . . . . . . . . . . . . . . . . . . . . . 47.60—47.61 mm (1.8739—1.8745 in.) Piston Pin Bore ID . . . . . . . . . . . . . . . . . . . . . . 47.62—47.63 mm (1.8748—1.8752 in.) CTM42 (24MAR95) 10-18 6076 Diesel Engines—S.N. (500000— ) RG,CTM42,G10,33-19-14FEB95 160101 PN=103