Crankshaft, Main Bearings and Flywheel/Complete Final Assembly COMPLETE FINAL ASSEMBLY 1. Install fan assembly. 2. Install oil pan and fill with clean engine oil. 3. Fill cooling system with proper coolant after engine installation and perform engine break-in. (See PERFORM ENGINE BREAK-IN in Group 05.) S55,2015,Y -19-29OCT92 15 52 CTM42 (24MAR95) 15-52 6076 Diesel Engines—S.N. (500000— ) 160101 PN=181