John Deere 400 6076 — John Deere 400 6076 User Manual

Air Intake System Operation and Test/Check Intake Manifold Pressure (Turbocharger Boost) • At Aneroid (If Equipped): 110 10 1. Remove aneroid line (A) from aneroid (B). 2. Install a 1/8-in. pipe nipple and “T” fitting (C) into aneroid with a 1/4-in. to 1/8-in. pipe reducer (D). RG5920 -UN-19AUG91 3. Connect aneroid line to “T” fitting. 4. Attach 1/8-in. NPT to 7/16-20 UNC Adapter (E) and JT03017 Hose (F) to JD03092 Pressure Gauge (G). 5. With engine at operating temperature, connect to a dynamometer. Operate engine at rated full load speed. A—Aneroid Line B—Aneroid Observe pressure readings. C—T-Fitting D—1/4—1/8 in. Pipe Reducer 6. Remove test equipment and reinstall aneroid line.

E—Adapter F—JT03017 Hose G—JT03092 Pressure Gauge RG,CTM42,G110,8-19-29OCT92 • At Intake Manifold: 6076A engine shown, use same procedure for 6076T and 6076H. 1. Remove ether aid starting line (A), if equipped, nozzle adapter and plug from intake manifold cover. 2. Install JT03104 Fitting (B) into cover. RG4130 -UN-14DEC88 3. Install a JT03017 Hose (C) with an accurate 0—400 kPa (0—4 bar) (0—60 psi) pressure gauge (D). 4. With engine at operating temperature, connect machine to a dynamometer. Operate engine at rated full load speed. Observe pressure reading. 5. Remove test equipment and reinstall ether starting aid A—Ether Starting Aid line.

B—JT03104 Fitting C—JD03017 Hose D—JT03092 Pressure Gauge CTM42 (24MAR95) 110-10 6076 Diesel Engines—S.N. (500000— ) RG,CTM42,110,7 -19-29OCT92 160101 PN=383