Cylinder Head and Valves/Perform Engine Break-In PERFORM ENGINE BREAK-IN 1. Run engine at slow idle no load for 2 minutes. Check for liquid leaks. 2. Increase RPM to fast idle, then load down to 50 rpm above rated speed for 20 minutes. NOTE: Dynamometer is the preferred load control, but engine can be loaded by matching drag loads to gear selection. 3. Recheck valve clearance and adjust as necessary. (See CHECK AND ADJUST VALVE CLEARANCE, earlier in this group.) 4. Install rocker arm cover gasket and cover. Tighten rocker arm cover cap screws to 8 N·m (6 lb-ft) (72 lb-in.).
(See COMPLETE FINAL ASSEMBLY OF INJECTION PUMP SIDE OF ENGINE, earlier in this group.) 05 42 Retorque of cylinder head cap screws after engine break-in is not required. IMPORTANT: After engine break-in, follow ALL recommended hourly service intervals outlined in your Operator’s Manual. RG,CTM6,G05,5 -19-14SEP94 CTM42 (24MAR95) 05-42 6076 Diesel Engines—S.N. (500000— ) 160101 PN=85