OPERATION 2. Drive the machine forward and operate the lift arm control lever forward to cut a thin layer of the surface each time when excavating the soil. ~k!)!Jg$~~ 3. Operate the lift arm control lever slightly up and down to reduce the resistance when driving the machine forward. 00 Ooooo 0 000 OCOE ooooo 0000 OoO*& 0 0 00,c OOOO a”OQpg OOOQ f-’ 0 0 r\ * 0 ~L17-cznol;; * When digging with the bucket, avoid imposing the digging force onto only one side of the bucket. A WARNING! Never dig or scoop when the machine is articulated. Precautions when scooping up materials. When scooping up materials, be careful not to let the counterweight at the rear touch the ground.
* Do not allow tires slipping to occur during operation. Tire slippage shortens tire’s life. LEVELING 1. Scoop soil into the bucket. Move the machine backward while spreading soil from the bucket little by little. 2. Go over the spread soil with the bucket teeth touching the ground and level the ground by backdragging. 3. Scoop some more soil into the bucket, put the lift arm in float, level the bucket at ground level, and smooth the ground by moving backward. L17CZO2 * Always move the machine backward during leveling operations. A WARNING! If leveling by forward travel can not be avoided, do not dump the bucket beyond 20”.
This will prevent quick wear and damage of the work equipment and frame. 2-44