12. OPERATION 12.6.2 OPERATION operating in parallel-arranged operation under no load YD When and switching to a load. 1. 6 Turn synchronizing switch @ to the “PARALLEL” position. pp =e OQ 2. # Turn “off” circuit breaker @ of each generator and the switch on the load side. ee 8 Seo AE726710 3. Adjust the frequency and voltage of each generator to the rated values with speed control handle @, then turn “on” circuit breaker @ of generator No. 1. 4. If the phase sequence of generator No. 1 is not matched to generator No. 2 (to be turned on), synchronizing lamps @ light up alternately.
In this case, stop the engine and change the connection of the generators, then confirm that the synchronizing lamps flashes simultaneously. 5. Turn speed control handle @ so that the flashing period of the synchronizing lamp of generator No. 2 (to be turned on) becomes longer. After the flashing period exceeds 5 seconds, at the moment it goes off, turn “on” circuit breaker @) of generator No. 2. 6. Operate generators No. 3 and after according to Step 4 and Step 5. 7. Ifthe ammeter reads more than “0”, adjust the voltage regulator of each generator so that the ammeter will read “0”. 8. Turn 9. “on” the switch on the load side.
Ifthe ammeters of all the generators do not read the same value, adjust them with speed control handle ©). 2-37