Detroit Diesel — Print Preview - C:\DOCUME~1\jcampb01\LOCALS~1\Temp\.aptcache\compdisp049\compdisp

EPA07 MBE 4000 SERVICE MANUAL 7.2.8 Installation of Brake Gate Solenoid Installation steps are as follows: 1. Secure the brake gate solenoid to the mounting bracket with two bolts. Torque the bolts to 25 N·m (18 lb·ft). See Figure 7-22. 2. Install the adaptor fitting and new washer in the side of the solenoid. Torque the adaptor fitting to 15 N·m (11 lb·ft). See Figure 7-22. 3. Connect the air supply line to the side of the brake gate solenoid with banjo bolt and new washers. Torque the banjo bolt to 15 N·m (11 lb·ft). See Figure 7-22. 4. Attach the air line to the bottom of the exhaust brake gate solenoid with adaptor fitting and new washers. Torque the adaptor fitting to 50N·m (37 lb·ft).

See Figure 7-22. 5. Attach the air line to the bottom of the exhaust brake gate solenoid with the banjo bolt and new washers. Torque the banjo bolt to 15 N·m (11 lb·ft). See Figure 7-22. 6. Connect the harness connector at the exhaust brake gate solenoid. All information subject to change without notice. DDC-SVC-MAN-0026 Copyright © 2011 DETROIT DIESEL CORPORATION 7-25