Detroit Diesel — Print Preview - C:\DOCUME~1\jcampb01\LOCALS~1\Temp\.aptcache\compdisp049\compdisp

7.3 ELECTRONIC PROPORTIONAL VALVE 7.3.2 Installation of Electronic Proportional Valve Installation steps are as follows: 1. Install the EPV mounting bracket to the block with two bolts. Torque the bolts to 100 N·m (74 lb·ft). See Figure 7-23. 2. Mount the EPV to the mounting bracket using two bolts. Torque the bolts to 25 N·m (18 lb·ft). See Figure 7-23. 3. Install the threaded connector to the side of the EPV. Torque the threaded connector to 50 N·m (37 lb·ft). See Figure 7-23. NOTICE: Avoid friction on compressed air pipe traveling under the EPV or potential damage to engine could result. 4. Install the brake gate solenoid. Refer to section 7.2.8. 5.

Install the brake gate solenoid line to the EPV and brake gate actuator solenoid. Torque the small banjo bolt to 15 N·m (11 lb·ft). See Figure 7-23. 6. Connect the wastegate line to the EPV with banjo bolt and new washers. Torque the banjo bolt to 25 N·m (18 lb·ft). 7. Connect the wiring harness connector to the EPV and exhaust brake gate solenoid. All information subject to change without notice. 7-28 DDC-SVC-MAN-0026 Copyright © 2011 DETROIT DIESEL CORPORATION