Detroit Diesel — Print Preview - C:\DOCUME~1\jcampb01\LOCALS~1\Temp\.aptcache\compdisp049\compdisp

EPA07 MBE 4000 SERVICE MANUAL NOTICE: Correct torque on the high-pressure fuel lines are critical. Incorrect torques could result in leaks or lack of power due to restricted fuel flow. 9. Install the high-pressure fuel line and transfer tube. Refer to section 2.4.2. 10. Install exhaust manifold. Refer to section 7.1.2. 11. Install the EGR cooler support bracket. Refer to section 8.3.4. 12. Install the EGR cooler. Refer to section 8.3.2 13. Install the air intake manifold. Refer to section 6.4.2. 14. Install the injector harness(s). Refer to section2.5.2. 15. Lubricate the pushrods with a light coating of engine oil and install the pushrods, in order, as removed. NOTE:

Make sure the pushrods are correctly seated in the valve tappets. 16. Install the valve bridges, in order, as removed. 17. Install the rocker arm assembly, in order, as removed. Tighten each rocker arm mounting bolt first to 60 N·m (44 lb·ft); then an additional 90°. Refer to section 1.21.4. 18. Install the engine barring tool (J–46392) and adjust the valves. For valve lash adjustment procedures, refer to section 13.1. 19. Remove the engine barring tool. (J–46392) Refer to section 1.17.1. 20. Install the inspection hole end cover on the flywheel housing and secure with two bolts. Torque the bolts to 25 N·m (18 lb·ft). 21. Check that the coolant drain plug is tight and not leaking. 22.

Fill the radiator with coolant. Refer to section 4.1.1. 23. Install the cylinder head cover. Refer to section 1.2.2. 24. Install the engine trim covers. Refer to section 1.1.2. NOTE: Prime the fuel system. Refer to section 12.1.5. All information subject to change without notice. DDC-SVC-MAN-0026 Copyright © 2011 DETROIT DIESEL CORPORATION 1-19