Detroit Diesel — Print Preview - C:\DOCUME~1\jcampb01\LOCALS~1\Temp\.aptcache\compdisp049\compdisp

1.3 CYLINDER HEAD 5. Using the head bolt socket (J–45389), install the cylinder head bolts. NOTE: For the correct tightening sequence, see Figure 1-12. Listed in Table 1-5 are the specific stages in the tightening sequence. Figure 1-12 Tightening Sequence, Cylinder Head Bolts Table 1-5 Cylinder Head Bolts Tightening Stages NOTE: If the stretch bolt tightening torque is exceeded, remove it, check its maximum permissible shaft length (replace if necessary), and tighten it from Stage 1. Unconditionally replace all bolts whose shaft length exceeds the maximum permissible value. 6. Replace the seal rings and connect the fuel injector spill line to the cylinder head.

Torque banjo bolt to 15 N·m (11 lb·ft). 7. Replace the seal rings and install the constant throttle line on the cylinder head. Torque banjo bolt to 35 N·m (26 lb·ft). 8. Connect the coolant line to the cylinder head. Torque banjo bolt to 35 N·m (26 lb·ft). All information subject to change without notice. 1-18 DDC-SVC-MAN-0026 Copyright © 2011 DETROIT DIESEL CORPORATION Size Max. Shaft Length mm (in.) Tightening Stage Torque N·m (lb·ft) (Repair work in the field) M15 x 2 212.0 (8.35) Stage 1 10 (7) Stage 2 50 (37) Stage 3 100 (74) Stage 4 200 (148) Stage 5 additional 90° Stage 6 additional 90°