Detroit Diesel — Print Preview - C:\DOCUME~1\jcampb01\LOCALS~1\Temp\.aptcache\compdisp049\compdisp

10.1 FRONT POWER TAKE-OFF 6. Install the FEPTO plate (hub) and secure with six bolts. Torque bolts in a criss-cross pattern to 60 N·m (45 lb·ft). See Figure 10-5. 1. Mounting Bolt 2. Plate (Hub) Figure 10-5 FEPTO Hub Plate 7. Install the drive belts on their pulleys, as removed. Refer to section 9.1.2 and section 9.1.4. 8. Install the lower mounting bolts of the front fairing/bumper, as removed. All information subject to change without notice. 10-6 DDC-SVC-MAN-0026 Copyright © 2011 DETROIT DIESEL CORPORATION