Daewoo Heavy Industries Mega 500-V — Axle (ZF AP 420R)

8. Install alternating outer and Inner plates (starting with one outer plate). Figure 139 9. Figure 140, shows the required arrangement of the outer plates. Figure 140 10. Insert backing plate - stepped plane surface is facing outwards. Figure 141 11. Hold plate pack into position using circlip. NOTE: See “Special Tools” on page 15. Figure 142 S0602170K Page 69 Axle (ZF AP 420R)