Return to Master Table of Contents REFRIGERANT RECOVERY 1 2 3 4 5 HDA6067L Figure 16 2 (50 psi), slowly open the low pressure valve. 2 2 3 1 4 5 HDA6068L Figure 17 1. Vacuuming Procedure. NOTE: When the A/C system has been exposed to the air, it must be vacuumed out. Perform vacuum process for 30 minutes for complete moisture and air evacuation. A. Attach the manifold gauges and vacuum pump to the refrigerant system as shown. B. Turn on the vacuum pump and open both valves. C. When the low pressure gauge shows approximately 710 mmHg, close both valves and turn off vacuum pump.
S0605050K Page 21 Air Conditioner Reference Number Description 1 To Compressor 2 Low Pressure Side 3 High Pressure Side 4 From Receiver 5 Refrigerant Recovery Tank 1. Attach the manifold gauges and the refrigerant recovery unit to the refrigerant lines as shown. NOTE: Be careful not to switch the connections for the low and high pressure valves. 2. Open the high pressure valve slowly to rele NOTE: Open the valve slowly, while che 3. When the manifold gauge dial falls below 3. 4. Open both the high and low pressure valve (0 psi). VACUUMING REFRIGERANT SYSTEM Reference Number Description 1 To Compressor 2 Low Pressure Side 3 High Pressure Side 4 From Receiver 5 Vacuum Pump