Daewoo Heavy Industries Mega 500-V — Air Conditioner

Return to Master Table of Contents 2. Check system for vacuum leak. Allow system to sit for 10 minutes and check whether the system is holding the pressure. If the pressure has dropped, it must be repaired before proceeding to the next step. 3. Vacuuming Procedure. If the system is holding the pressure and it has not changed for 10 minutes, vacuum out the system for an additional 20 minutes. HDA6069L Figure 18 A. Turn on the vacuum pump and slowly open both valves. B. Allow vacuum pump to run for additional 20 minutes until the low pressure gauge dial reads approximately 750 mmHg. C. Close both valves and stop the vacuum pump. 4. Installation Of Refrigerant Container. 1 2 A.

Before mounting valve on the container, make sure the handle is in the counterclockwise most position, with the puncture pin retracted and the mounting disk is in the raised position. 3 HDA6070L Figure 19 B. Attach the manifold gauge center hose to the valve assembly. C. Turn the disc in the clockwise direction and securely mount valve onto refrigerant container. D. Turn the valve handle in the clockwise direction and puncture the container seal with the pin. E. Once the can has been punctured, turn the handle in the counter clockwise direction so the refrigerant can flow into the manifold gauge center hose. At this time, do not open the low and high pressure valves of the manifold gauge. F.

Press the manifold gauge low side valve to eliminate the trapped air in the hose. LEAKAGE CHECK 1. After attaching the manifold gauge, open the high side valve. NOTE: Perform the leakage check after completing vacuuming process. 2. Charge system until the low side gauge dial indicates a pressure of 1 kg/cm 2 (14 psi) and close the high side valve. S0605050K Page 22 Air Conditioner Reference Number Description 1 Handle 2 Hose Connection 3 Mounting Disk