Daewoo Heavy Industries Mega 500-V — Transmission and Torque Converted (ZF 4WG-310)

7. Introduce pressure regulators and secure them using retaining plates and socket head screws. NOTE: Install retaining plates, with the claw facing downward. Pay attention to the radial installation position of the pressure regulators, Figure 61. NOTE: Torque limit 5.5 Nm (4 ft lb). Figure 61 8. Pre-assemble opposite side. A. Figure 62, shows the following components: Figure 62 B. Install components according to Figure 62. C. Preload compression springs of the follow-on slides and secure the spools provisionally with cylindrical pins aid), see arrows. D. Install two adjusting screws. E.

Line up flat gasket (1, Figure 63) and housing cover and bring them uniformly against shoulder, using adjusting screws. Figure 63 F. Now, fasten housing cover using socket head screws. NOTE: Torque limit 5.5 Nm (4 ft lb). G. Remove cylindrical pins (assembly aid) again. S0607080K Page 53 Transmission and Torque Converter (ZF 4WG-310) Reference Number Description 1 Main Pressure Valve (1x Spool and Compression Spring.) 2 Follow On Slide (3x Spool and Compression Spring) 3 Vibration Damper (3x Spool and Compression Spring)