Daewoo Heavy Industries Mega 500-V — Transmission and Torque Converted (ZF 4WG-310)

TRANSMISSION REASSEMBLY 1. Install studs (Figure 170). NOTE: Wet thread with Loctite #243 CAUTION! According to the transmission version, differences concerning number and length of the studs are possible. See in this connection the corresponding Spare Parts List. Figure 170 2. Line up O-ring (Figure 171). 3. Insert bush into the housing bore until contact is obtained and fasten it. Figure 171 POWER TAKE-OFF 1. Supercool the shaft (about -80˚C (- 112˚F)), heat gear (about 120˚C (248˚F)) and line it up, resp. press it against shoulder. Figure 172 S0607080K Page 82 Transmission and Torque Converter (ZF 4WG-310)