Daewoo Heavy Industries Mega 500-V — Transmission and Torque Converted (ZF 4WG-310)

2. Press inner bearing race against shoulder. 3. Press opposite inner bearing race against shoulder. Figure 173 4. Insert outer bearing race (Figure 174) into the housing bore until contact is obtained. Figure 174 5. Position pre-assembled PTO shaft in the housing, and insert outer bearing race until contact is obtained. Figure 175 6. Adjust Axial play – Power take-off bearing – max. 0.10 mm (0.0039 in) using shim(s) and circlip. Figure 176 S0607080K Page 83 Transmission and Torque Converter (ZF 4WG-310)