Komatsu — (2) Reassembly

6. Turbocharger (for 4TNE106T) 8.6 Reassembly Procedure (1) Preparation for reassembly @ Prepare general tools, special tools, liquid gasket,(Three Bond No.1 207) and Locktite No.242 before reassembling the @ Always replace the following parts with Lubricating oil inlet turbocharger. new ones: n Y _CircliD l Turbine side seal ring 1 pc. l Compressor side seal ring (large) 1 pc. 22 bating metal ._ n 5 l Compressor side seal ring (small) 1 pc. l M3 machine screws 3 PCS. l M3 machine screws 4 PCS. (2) Reassembly Lubricating oil inlet .Match UP Contact !iWbCe , (2.1) Floating bearing installation @ Use the snap ring pliers and install inner B circlip 16 on bearing housing 15.

@ Install floating bearing 5 in bearing hous- ing 15. @ Use the snap ring pliers and install outer circlip 16 on bearing h&sing 15. Note-l) The circlip joint shall be posi- 1 For all other than above 1 tioned as shown in the figure at right above. Note-Z) Apply lubricating oil on the floating bearing before reassembly. The rounded side of the circlip shall face the bearing. (2.2) Turbine shaft installation @I Fit the seal ring onto turbine shaft 1. @ install heat insulating plate 20 on the turbine side of bearing housing 15. @I Apply lubricating oil on the journal portion of the turbine shaft and insert the shaft from the turbine side of bearing housing 15.

Note) Careful/y operate so as not to damage the floating bearing by the turbine shaft. The seal ring joint shall be positioned on the lubricating oil inlet side affer center- ing with the turbine shaft. (2.3) Thrust bearing installation @ Apply lubricating oil on the bearing portion of thrust bearing 6 and install it in bearing housing 15. @ Fit thrust bushing on turbine shaft 1. @ Apply Locktite on the threaded portion of M3 Torx T machine screw 17 for thrust bearing installation, and use Torx torque driver for installation by tightening to the specified torque. Tightening torque: 13 fl kgf-cm (1.3 + 0.1 N-m) 8-14