8. Turbocharger (for 4TNE106T) L.O. inlet (2.4) Seal plate installation 0 Fit the seal ring on oil thrower 2. @ Insert oil thrower 2 into seal plate 4. Note) The seal ring joint portion shall be positioned as il- lustrated above. @ Apply liquid gasket (Three Bond No. 1207) on the seal plate mounting surface on the compressor side of bearing hous- ing 15. View from the compressor Note) See the illustration at right for the applying position. Applying thickness : 0.1 to 0.2 mm @ Install seal plate 4 on bearing @ Apply Locktite on the threaded portion of M3 machine screw for seal plate mounting, and tighten it with a torque screw- driver. housing 15. Tightening torque:
13&l kgf-cm (1.3fO.l N-m) (2.5) Compressor impeller installation (iJ Fit compressor impeller 18 onto turbine shaft 1. @ Set a box spanner (10 mm) on the turbine side end of turbine shaft 1, and tighten shaft end nut 19. Liquid gaske applyinq position _ -. Carefully prevent the liquid gasket from leaking out to this area. Note) Since the shaft end nut has left-handed screw, pay attention to the tightening direc- tion. Tightening torque: 20x2 kgf-cm (2.0H1.2 N-m) (2.6) Turbine housing installation 0 Install bearing housing 15 on turbine housing 11 by aligning the match marks put before disassembly.
Note) In case of part replacement, check the oil inlet and outlet positions and the ex- haust gas inlet position before reassembly. @ Install the turbine side keep plate and tighten M8 hexagon bolt 12. Tightening torque: 285flO kgf-cm (28fl N-m) 8-15