MACHINE OPERATIONS AND CONTROLS OPERATION 3. Operate bucket (3) and arm (4) control levers slowly to move the bucket and arm cylinder to the ends of their stroke. Arm operation Bucket operation Out Dump 4. Operate the bucket and the arm fully, in turn for 30 sec- onds, for 5 minutes. In REMARK Turn swing lock switch (5) ON (ACTUATED) and operate the lever to make the oil temperature rise more quickly. Curl NOTICE When the work equipment is retracted, take care that it does not interfere with the machine body or ground. 5. After carrying out the warming-up operation, check that all the gauges on machine monitor (6) and the caution lamps are in the following conditions.
Radiator water level monitor (7): OFF Engine oil level monitor (8): OFF Charge monitor (9): OFF Fuel level monitor (10): Green display Engine water temperature monitor (11): Green dis- play Engine oil pressure monitor (12): OFF Engine water temperature gauge (13): Indicator in black range Fuel gauge (14): Indicator in black range Preheating monitor (15): OFF Air cleaner clogging monitor (16): OFF Hydraulic oil temperature gauge (17): Indicator in black range Hydraulic oil temperature monitor (18): Green dis- play 6. Check that there is no abnormal exhaust gas color, noise, or vibration. If any abnormality is found, repair it. 7.
If air cleaner clogging monitor (16) is lighted up, clean or replace the element immediately. For details of the method of cleaning the element, see "CHECK, CLEAN AND REPLACE AIR CLEANER ELE- MENT (PAGE 227)". 8. Turn fuel control dial (2) to the full speed (MAX) position and carry out the operation is Step 4 for 3 to 5 minutes. 9. Repeat the following operation 3 to 5 times and operate slowly.
Boom operation RAISE LOWER Arm operation IN OUT Bucket operation CURL DUMP Swing operation LEFT RIGHT Travel (Lo) operation FORWARD REVERSE Full speed max REMARK In the above operation is not carried out, there may be a delay in response when starting or stopping each actuator, so con- tinue the operation until it becomes normal. 148