TRANSPORTATION OPERATION 4. Pass wire ropes between the 1st and 2nd track rollers from the front and between the 1st and 2nd track rollers from the rear. For machines equipped with a full roller guard for the track roller, pass the wire rope under the track. 5. Ensure that the centre of gravity mark is centrally located between the lifting wires 6. Set the lifting angle of the wire rope to 30є to 40є, then lift the machine slowly. 7. After the machine comes off the ground, check carefully that the machine is balanced, then lift slowly. 184