Komatsu — Checks Before Starting

MAINTENANCE SCHEDULE MAINTENANCE MAINTENANCE SCHEDULE If the machine is equipped with a hydraulic breaker, the maintenance schedule for some parts will be different. For details, see "MAINTENANCE INTERVAL FOR HYDRAULIC BREAKER (PAGE 225)" to confirm the correct main- tenance schedule when carrying out maintenance. MAINTENANCE SCHEDULE CHART Initial 250 Hours Maintenance (Only after the first 250 hours) REPLACE FUEL FILTER CARTRIDGE...............................................................................................................

261 Initial 1000 Hours Maintenance (Only after the first 1000 hours) CHECK ENGINE VALVE CLEARANCE, ADJUST............................................................................................... 272 When Required CHECK, CLEAN AND REPLACE AIR CLEANER ELEMENT ............................................................................. 227 CLEAN INSIDE OF COOLING SYSTEM............................................................................................................. 232 CHECK AND TIGHTEN TRACK SHOE BOLTS ..................................................................................................

235 CHECK AND ADJUST TRACK TENSION........................................................................................................... 236 CHECK ELECTRICAL INTAKE AIR HEATER ..................................................................................................... 238 REPLACE BUCKET TEETH ................................................................................................................................ 239 ADJUST BUCKET CLEARANCE.........................................................................................................................

239 CHECK WINDOW WASHER FLUID LEVEL, ADD FLUID................................................................................... 241 CHECK AND ADJUST AIR CONDITIONER (IF EQUIPPED).............................................................................. 242 WASHING WASHABLE FLOOR.......................................................................................................................... 243 METHOD OF SETTING MACHINE ANGLE ........................................................................................................ 245 BLEEDING AIR FROM HYDRAULIC SYSTEM...................................................................................................

246 METHOD FOR RELEASING INTERNAL PRESSURE IN HYDRAULIC CIRCUIT.............................................. 248 Checks Before Starting 222