MAINTENANCE MAINTENANCE PROCEDURE EVERY 250 HOURS MAINTENANCE CHECK OIL LEVEL IN MACHINERY CASE, ADD OIL The parts and oil are at high temperature after the engine is stopped, and may cause serious burns. Wait for the temperature to go down before starting the operation. 1. Remove dipstick (G) and wipe the oil from the dipstick with a cloth. 2. Insert dipstick (G) fully in the guide. 3. When dipstick (G) is pulled out, if the oil level is between the H and L marks of the gauge, oil level is proper. 4. If the oil does not reach the L mark on dipstick (G), remove oil filler (F), and add engine oil. then remove air bleed plug (1). 9JM04442A 5.
If the oil level exceeds the H mark on the dipstick, loosen drain plug (P) to drain the excess oil. 6. After checking oil level or adding oil, insert the dipstick (G) into the hole and install air bleed plug (1). 9JM04443A LUBRICATING NOTICE When operating the machine for the first 50 hours, carry out the greasing every 10 hours. After carrying out digging work in water, always grease the pins that were under water. When carrying out heavy-duty operations, such as hydraulic breaker operations, carry out the greas- ing every 100 hours. 1. Set the work equipment in the greasing position below, then lower the work equipment to the ground and stop the engine. 2.
Using a grease pump, pump in grease through the grease fittings shown by arrows. 3. After greasing, wipe off any old grease that was pushed out. 251 WARNING