N5A0208E N5A0207E Install ATF pipes to hydraulic booster. 3. Brake Pipe and Hose 2. ATF Pipe 5. Heat Protector Install hydraulic booster heat protector. 6. Instrument Panel and Duct Install master cylinder hydraulic lines to master cylinder. 4. Steering Wheel and Column Assembly Install ventilation duct and instrument panel as- sembly. 7. Meter Set steering wheel and column assembly. Install meter assembly and harness connector. 8. Meter CIuster Install mounting bolts, nuts and screws to body. Install key bolt and nut. Install meter cluster. 9. Battery ground cable. 10.
After attaching it to the vehicle, always replenish with new hydraulic oil (Besco ATF Ill), and com- pletely release the air from the hydro boost. 11. Bleed brake lines. 12. Release the parking brake and remove the wheel blocks. Tighten: Key bolt to 38 N m (3.9 kg m / 28 lb ft) Install inspection window.