Caution: Secure the dial gauge so that a stroke of 2 mm (0.08 in) can be measured. Do not over-tighten the nut as the dial gauge shaft may jam. (Confirm from the dial gauge that the shaft moves smoothly.) N6A0867E 8. Operate the nozzle tester and increase the in-line pressure to 34.3 — 44.1 MPa (350 — 450 kg/cm 2 / 4,975 — 6,396 psi) so that the nozzle’s needle valve moves through its full lift. Record full lift ‘L’. (Read dial gauge) Nozzle Full Lift mm (in) 0.30 (0.0118) Notice: The above operation is used to determine whether the nozzle seat is worn and whether the nozzle assembly is in good condition. N6A0873E Legend 1. Dial gauge 2. Nut 3. Holder 4. Pin 5. Nozzle holder 6.
First spring seat 6. Set the nozzle holder (1) to the nozzle tester (2) and put needle to zero on the dial gauge. 7. Operate the nozzle tester to bleed any air from in- side the retaining nut and to confirm that no fuel leaks. N6A0875E Legend 1. Needle valve 2. First nozzle opening pressure 34.3 — 44.1 MPa (350 — 450 kg/cm 2 / 4,975 — 6,396 psi) 3. In line pressure