Isuzu — Isuzu N Series Training Manual

Pre-lift Confirmation 1. With the needle valve at full lift, release the nozzle tester handle. Read the dial gauge at first nozzle opening pressure +approx 1 MPa (10 kg/cm 2 / 145 psi) . Notice: The in-line pressure will decrease and needle valve lift (as indicated on the dial gauge) will also decrease a lit- tle. Notice: This point can be found while the pressure is decreas- ing. N6A0876E Legend 1. Pressure gauge N6A0878E Legend 1. Needle valve lift 2. Measuring point of prelift 3. First nozzle opening pressure 3. Confirm that pre-lift ‘l’ is as specified. N6A1650E Legend 1. Needle valve lift 2. In line pressure 2.

Read the needle valve lift ‘l’ from the dial gauge in- dication (once the needle valve has descended when the second spring has stopped operating). Refer to the pre-lift measuring point for ‘l’. Pre-lift measuring point: N6A0879E Pre-lift Engine Pressure MPa (kg/cm2 / psi) Lift mm (in) 4HG1-T 19.1 (195/2,770) 0.04 (0.0016)