Legend 1. Push rod 2. Spring seat 3. Spacer 4. Second spring 5. Adjusting shim 6. Lift piece 7. Needle valve 4. If pre-lift is not as specified, replace the pins, lift piece, spacer and nozzle assembly as a set with the service kit. Service kit: 4HG1-T 897313-8970 N6A0867E Legend 1. Nozzle holder 2. Nozzle tester 2. Release the nozzle tester handle so that in-line pressure decreases. Notice: The in-line pressure will decrease and needle valve lift (as indicated on the dial gauge) will also decrease a lit- tle. N6A0880E Legend 1. Lift piece 2. Nozzle assembly 3. Pin 4. Spacer 5. Capsule Second Nozzle Opening Pressure Confirmation 1.
After pre-lift confirmation, operate the nozzle tester to increase in-line pressure to 34.3 — 44.1 MPa (350 — 450 kg/cm 2 / 4,975 — 6,396 psi) so that the nozzle’s needle valve moves through its full lift. N6A1651E Legend 1. Needle valve lift 2. Second nozzle opening pressure 34.3 — 44.1 MPa (350 — 450 kg/cm 2 / 4,975 — 6,396 psi) 3. In line pressure 3. Then, read the pressure gauge indication (second nozzle opening pressure) the instant that the dial