Isuzu — Isuzu N Series Training Manual

Boost compensator adjustment 1. Select a push rod so (C) = 37.5 ± 0.5 mm (1.48 ± 0.02 in) at full boost pressure. ((C) is the distance from the end face of the housing to top of the lever.) 2. Adjust the boost compensator stroke using screw (A). (0 boost pressure position adjustment) Adjust the beginning of boost compensator opera- tion by adjusting the notch adjusting nut (B). 6. Confirm that the pre-stroke output voltage is within the range b1 — b2. N6A0965E Legend 1. Top of lever 2. Push rod 3. Boost pressure inlet 4. Boost compensator spring Timing cam adjustment (Timing cam No: 510) 1. Hold speed control lever against full speed stopper bolt. 2.

Supply boost pressure of at least 44.0 kPa (330 mmHg/6.38 psi) 3. Operate pump at the timing cam adjusting point (point a table below: Np = 1,000 r/min). 4. Perform timing cam adjustment so output voltage is within range of a1 — a2 actually measured for pore-stroke output voltage during injection timing adjustment in 3 — 4. 5. Operate the pump at the timing cam confirmation point. (point b in table below: Np = 1,200 r/min) Confirmation point Pre-stroke (mm (in)) Output voltage (actual) Remarks b 3.24 (0.1276) b1 + tolerance 3.04 (0.1197) b2 − tolerance Adjusting point Pre-stroke (mm (in)) Output voltage (actual) Remarks a 3.70 (0.1457) a1 + tolerance 3.44 (0.1354) a2 − tolerance