Isuzu — Isuzu N Series Training Manual

19. Vacuum Pump Assembly 1) Position the pump rotor together with the pump housing on the center plate. The rotor serrated side must be facing up. N6A1082E Use a fully charged battery to conduct the mea- surement with the current outputted from the battery terminals at 5A or less. 2) Rotate the rotor to align the rotor bore with the center plate bore. 3) Install the housing, the rotor, and the center plate. The O-ring must not be projecting beyond the center plate slot. Take care not to scratch the vanes. 4) Turn the housing to align it with the center plate. 5) Tighten the vacuum pump fixing bolts. N6A1081E Notice: When conducting the performance test:

For the connection between the generator B terminal and the battery (+) terminal and between the E terminal and the battery ( ) terminal, use a lead wire with a cross section of 8 mm 2 and the length of 2.5 m or less. 2. Adjusting voltage measurement Tighten: Vacuum pump fixing bolt to 7 N m (0.7 kg m / 61 lb in) 6) Add 5cc of engine oil through the filler port. 7) Check that the generator spins smoothly by turning it with your hand. Inspection Performance Test 1. Generator Connect the generator as shown in the illustra- tion. N6A1082E Open SW1 and close SW2. With the number of the generator rotations raised up to its rated rotations of 5,000 rpm, measure the adjusting voltage.

Adjusting voltage = 28 - 29V Check to see if the fluctuation in the adjusting voltage is not caused by the increased number of rotations. 3. Measurement of the number of rotations at 27V Open SW1 and close SW2.