. OPERATION OPERATION OPERATION OPERATION 6. When the engine starts, release the key in starting switch (2). The key will return automatically to the ON position (B). REMARK Immediately after an engine startup, keep the engine idling, and while the engine is idling, keep the foot off the deceleration pedal and do not operate the work equipment. 3 - 113 2. Insert th e ke y into starting switch (2) and t urn the key to t he ON position (B). 3. Check t hat e ngine pre-heating monitor (3) on the monito r panel lights u p. 4. Maintai nthe key i n the ON position (B) unt il e nginep re-heating monitor (3) g oes off. 5.
When e ngin e pre-heating monitor (3) goes off, t urn the key of starting switch (2) to the S crank th e engine. The tim e tha t engine pre-heating monitor (3) stays o n changes according to th e ambient te mperature as s hown in the ta ble below . position (C) to Ambient temperature Pre-heat time -3°C to -10°C (27°F to 14°F) 5 to 15 seconds -10°C to -20°C (14°F to -4°F) 15 to 32 seconds -20°C to -30°C (-4°F to -22°F) 32 to 45 seconds