OM2049 2/13 Safety - Section 20 Page 20-15 MANUAL DC LINK CAPACITOR DISCHARGE PROCEDURE The generator field is cut out via GF cutout switch (2, Figure 20-6) in the low voltage area of the control cabinet. Preparation 1. Apply control power for a minimum of 30 sec- onds. Then, turn off control power using control power switch (1) on the switch panel. Follow any and all local and site specific procedures and requirements for working on off-highway mining equipment. With control power on, an RP contactor closes and discharges the DC link through the retard- ing grids in less than 10 seconds. Verify that: The engine is off and the parking brake is on. FIGURE 20-6. INFORMATION DISPLAY PANEL 1.
Control Power Switch 2. GF Cutout Switch 3. Capacitor Charge Light